About the Project
NYCREATES – Albany NanoTech Complex Expansion (NFR) project
The project scope includes designing and constructing new cleanroom and related facilities including support buildings, process support systems, and a parking garage. The project will feature a cleanroom with a waffle table consisting of 50,000 SF ISO Class 5 and approximately 50,000 SF of non-clean subfab. This is in order to provide the type of construction required for cleanrooms within the more than 310,000 SF building. Also included are two levels of clean space, two additional levels of support space above the operating level, and a penthouse on the roof.
NYCREATES, in partnership with DPS|Gilbane, is committed to designing and building this state-of-the-art facility in a sustainable and energy-efficient manner. It is a critical objective of the project to achieve the highest level of Leadership in Energy and Environmental Design (LEED) certification.
Anticipated Bid Packages
Q3 – 2024
-
Subcontracts: Process Mechanical Installation, Instrumentation & Controls, UPW/WWT Design & Equipment, Cleanroom Installation, Parking Garage (Turnkey), Subfab Off-Site Manufacturing
Q4 – 2024
- Subcontracts: Architectural Interiors, Cleanroom Protocol, Cleanroom Cleaning, Cleanroom Certification, Final Sitework / Paving / Landscaping, TGMS, Telecom/IT, Trestle, UPW/WWT Installation (Elec), UPW/WWT Installation (Process)
General Requirements: Third Party QA (MEP)
Awarded:
- 03B Popout Assemblies: FH Chase
- 03E Elevated Decks: Jersen Construction Group
- 03F Cast-in-Place Foundations: Jersen Construction Group
- 05A Steel Supply & Installation: Beauce Atlas
- 07A Metal Cladding: Manheim Dellovade
- 07B NFX Make Ready/Egress: Jersen Construction Group
- 07C Roofing: Titan Roofing
- 07D Intumescent Fireproofing: FCS Group
- 13E Cleanroom FFUs: Diversified Fluid Solutions
- 14A Elevator Installation (Freight): Otis Elevator
- 14B Material Lift: Arbon Equipment
- 14C Chemical Lift: Arbon Equipment
- 14D Passenger Elevator: Schindler Elevator
- 21A Fire Protection: Davis-Ulmer Sprinkler / SRI Fire
- 22A Wet Mechanical Installation: T. Lemme Mechanical
- 23A Dry Mechanical: Kleeberg Sheet Metal
- 23B Chillers: Trane Technologies
- 23F MAUs: RF Peck Company
- 23G Cooling Towers: Northeast HVAC Solutions
- 26A High Yard Installation: Applied High Voltage
- 26B Electrical Installation: O’Connell Electric
- 26C Early Electrical: Gross Electric
- 26D Substation: Turtle & Hughes
- 26E Switchgear (MV): Turtle & Hughes
- 26F Generators: Milton CAT
- 26G LV Panels/Switchgear: Turtle & Hughes
- 31A Site Enabling: Wesson Group
- 31C Deep Foundations: Manafort Brothers, Inc.
- 44A RCTO: Munters
- 44B Scrubbers: Verantis Environmental
- 45A AHU: Trane
- GR03 Trash/Recycle Services: County Waste
- GR04 Temp Restrooms/Sanitary: Stone Industries
- GR05 Site Services: Next 150 Construction
- GR06 Third Party QAR: Atlantic Testing Laboratories
- GR07 Vibration Monitoring: Atlantic Testing Laboratories
- GR08 Site Survey: SY Kim Land Surveyor
- GR09 Hoisting: Three D Rigging and Construction
- GR10 SWPPP Inspections: CME Associates
- GR12 Security Personnel: Arrowhead Security
- GR16 Commissioning: Lotus Works
- GR18 Temporary Fencing: Veteran Fencing
- GR19 Snow Removal: Radical Property Management
- GR20 Break Trailer: Wilscot Mobile Mini
*Subject to change
**All businesses interested in bidding as a Prime/Tier-1 subcontractor must prequalify to receive an invitation to bid.
Contractor Information Sessions
Check back often for registration details on upcoming Contractor Information Sessions for the NYCREATES – Albany NanoTech Complex Expansion (NFR) project.
Past Sessions:
July 23, 2024
Albany, NY
March 27, 2024
Albany, NY
January 24, 2024
Albany, NY
November 8, 2023
Albany, NY
DPS | Gilbane is committed to driving opportunities for diverse and local businesses.
Contractor Interest
Thank you for your interest in working with us on the NYCREATES – Albany NanoTech Complex Expansion (NFR) project. Please click below to register your interest:
DPS | Gilbane Contacts
Project Executive
Christian Calabrese
CCalabrese@Gilbaneco.com
1-518-242-5998
Sr. Purchasing Agent
Levi Washburn
LWashburn@Gilbaneco.com
1-518-292-0965
Economic Inclusion Director
John Rooney
JRooney@Gilbaneco.com
1-646-682-2270
Project Executive
Nathan W. Speanburg
Nathan.Speanburg@arcadis.com
1-518-301-1507
Procurement Manager
Rachel Sciolino
Rachel.Sciolino@arcadis.com
1-518-430 8312
Project Engineer
Patrick Connelly
PConnelly@Gilbaneco.com
1-518-292-5607